Questions.
What it costs, how long it takes, who owns the code, and whether you’re too early to start. Answered the way I’d answer them on a call.
No — that's half of what I do. You don't need a spec, a deck, or a technical co-founder. You need to be able to describe the problem and who has it. I'll turn that into something real enough to put in front of people, and we'll find out what's actually true.
Starting outThat's the other half. I map where the time actually goes, then build the thing that removes it — usually an automation, an internal tool, or an integration between two systems that should have been talking years ago.
Book a call and I'll tell you honestly. If your business is running fine and software would only add complexity, I'll say so. I'd rather lose the project than sell you something you'll resent paying for.
Less than the problem does. Repetitive admin, disconnected tools and slow follow-up look much the same whether you're selling property, running a clinic or shipping orders. If you can describe how the work happens today, that's enough to start.
Most projects are scoped around one workflow and quoted as a fixed price after a short call, so you know the cost before any work starts. Third-party running costs, such as SMS, hosting and AI usage, are billed by those providers directly to you.
Weeks, not quarters. A single automation can be live in days. An MVP is typically a few weeks to something real people can use. If a timeline is unrealistic I'll tell you at the quote, not at the deadline.
Only if you want one. There's no lock-in and no retainer trap. A project that ends when the thing is built and working is a perfectly good outcome — I'd rather that than an invoice you've stopped noticing.
Small changes I absorb — if it's a tweak, it's a tweak, and you won't hear about it on an invoice. Anything big enough to move the work gets re-priced before I build it, so you know the number first. Scope changes are normal; surprise invoices aren't.
I do. Every project is built by me, Rishabh, from first call to handover. There's no junior to hand you to and no account manager between us.
Six steps: discover, map, design, build, integrate, improve. You approve the design before a line of code exists, so nothing gets built that you haven't already seen described.
Heavily at the start, barely in the middle. I need real access to how the work happens today — the messy version, not the version in the process document. After that I'll come back with something to react to.
You'll have seen it coming. I show work early and often specifically so that a mismatch surfaces in week one rather than at handover. If something's wrong, I fix it before it's finished.
Yes. The code, the data and the accounts are yours. Nothing is hosted on my infrastructure in a way that traps you, and nothing stops another developer picking it up.
That's usually the point. Integrations are one of the six things I build — CRMs, spreadsheets, WhatsApp, accounting tools, whatever you already pay for. A system that lives in its own tab isn't finished.
No. Some of it uses language models, because for some problems that's genuinely the right tool. Plenty of it is ordinary software — a scheduler, a dashboard, a pipeline between two systems. I pick what fits the problem rather than what sounds impressive.
Your data stays in systems you control. Where a third party is involved — a model provider, an email service — I'll name it before we start rather than after. What this website itself collects is written out in the privacy policy.
I watch it run. The last step of the process is improvement, because the first version of anything meets reality and reality has opinions. Small fixes in the settling-in period aren't a new invoice.
Yes, if you want that — or you can take it in-house. The handover is real either way: documentation written for whoever picks it up next, not just for me. Keeping me on should be a choice, never something the build quietly forces on you.
We agree what number should move before I build anything — hours saved, response time, error rate. If it isn't moving a number, it isn't finished.